Our System Install covers
Removal of old equipment
Disposal of old equipment
Installation of new indoor unit
Installation of new outdoor unit
Installation of new evaporator coil
New pad (if needed)
New disconnect (if needed)
New whip and fittings (if needed)
Brazing refrigerant lines
Nitrogen purge while brazing
New filter drier
Pressure test
Vacuum to proper micron level
Refrigerant charge adjustment
Electrical connections
Drain line connections
Condensate safety switch (if included in proposal)
Thermostat hookup (or new thermostat if included)
Startup and commissioning
Verification of temperature split, pressures, amp draws, subcooling/superheat
Permit and inspection if included in contract
Our System Install covers
Removal of old equipment
Disposal of old equipment
Installation of new indoor unit
Installation of new outdoor unit
Installation of new evaporator coil
New pad (if needed)
New disconnect (if needed)
New whip and fittings (if needed)
Brazing refrigerant lines
Nitrogen purge while brazing
New filter drier
Pressure test
Vacuum to proper micron level
Refrigerant charge adjustment
Electrical connections
Drain line connections
Condensate safety switch (if included in proposal)
Thermostat hookup (or new thermostat if included)
Startup and commissioning
Verification of temperature split, pressures, amp draws, subcooling/superheat
Permit and inspection if included in contract